1. A project start meeting
2.Get the PRS (Product Requirement Specification) or any other SOW (Statement Of Work) from configuration management tool.
3. Study phase - PRS
4. Validate PRS with respect to SOW
5.Get design doc from developer through configuration management.
6. Analyse requirements and implementation based on PRS and Design Doc.
7. Prepare test cases and formulate ATP(Acceptance Test Plan) .
8.Generate Traceability matrix with respect to ATP.
9. Test setup.
10. Testing and bug filing.
11. Test Report generation.
This is what I have understood when I have undergone a training conducted by my quality team member. All the above steps are to be followed in each phase of the design to make a successful and defect free product.
Am currently working on a project which is basically a network project on Linux OS, with this start again I have to study and understand about Networking, few of the followings which is very important to understand about my current project and that my Project Manager has suggested to read.
1.Introduction to Networking
2.Types of Network
- LAN
- MAN
- WAN
- WLAN
- VLAN
4. Network Operating Systems
5. Network Protocols
The list goes on increasing, I have started to study simultaneously all the concepts together, because it was and is very much necessary for to adjust to the pace of the project, but still I have to know and understand a lot about all these.I have come across many more things which were very challenging to achieve both practically and logically, friends I will write with few such examples in my forthcoming posts.